NATIONAL HIGHWAY DETAILS
S.No. |
N.H. no. |
Name of National Highway |
Length in Chhattisgarh (Km.) |
Remarks (Districts covered) |
1 |
6 |
Dhuliya Nagpur -Raipur Sambalpur |
318.40 |
Mahasamund,Raipur,Durg, Rajnandgaon |
2 |
43 |
Raipur - Jagdalpur - Vijayanagaram |
313.60 |
Raipur,Durg,Dhamtari,KankerBastar |
3 |
16 |
Bhopalpattanam - Geedam - |
217.00 |
Bastar,Dantewada |
4 |
78 |
Shahdol Ambikapur Jashpurnagar -Gumla |
354.20 |
Koriya,Sarguja |
5 |
200 |
Raipur -Bilaspur Champa -Raigarh-Jharsugda |
312.60 |
Raipur,Durg,Bilaspur |
6 |
202 |
Haidarabad - Varngal - Bhopalpattanam |
36.00 |
Dantewada |
7 |
12-A |
Simga - Kawardha - Chilfi - Mandla |
126.00 |
Raipur,Durg,Kabirdham |
8 |
216 |
Saraipali - Sarangarh - Raigarh |
86.80 |
Mahasamund.Raigarh |
9 |
217 |
Arang - Mahasamund -Khariyar Road |
65.60 |
Mahasamund |
10 |
111 |
Bilaspur-Katghora-Ambikapur |
223.00 |
Bilaspur, Korba, Sarguja |
11 |
221 |
Jagdalpur-Sukma-Konta |
172.00 |
Bastar, Dantewada |
|
|
Total |
2225.20 |
All Districts. |
PROGRESS OF NATIONAL HIGHWAY WORKS
2004-2005
S. No. |
N.H. No. |
NAME OF WORK |
JOB No. |
DATE OF SANCT. ORIGINAL & REVISED |
SANCTIONED COST ORIGINAL & REVISED |
LENGTH Km. |
EXPENDITURE |
STATUS OF WORK AS ON 6/04 |
UPTO DATE 6/04 |
|
|||||||
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
1 |
006 |
YEAR
1999-2000 Strengthening in Km. 354 to 364 on NH-6 |
006-MP-99-175 |
6.2.2000 |
407.24 355.11 |
11.0 |
346.19 |
Progress |
2 |
078 |
YEAR 2001-2002
Improvement
& widening of single lane road to two lane road in Km. 502 to 511 of NH-78 |
078-CG-2001-02-13 |
22.5.2001 |
421.71 |
10.0 |
277.39 |
Progress |
3 |
200 |
YEAR
2002-2003 Recontruction
of 16 Nos. culverts from Km. 8/10 to 77/6 of N.H. 200 |
200-CG-2002-03-66 |
13.3.2003 |
38.00 |
-- |
18.46 |
Progress |
4 |
200 |
YEAR
2003-2004 Construction
of paved shoulder in Km. 117/2 to 118/10 |
200-CG-2003-04-99 |
29.8.2003 |
48.18 |
-- |
-- |
Tender |
5 |
12A |
Construction
of H.P. culvert and road side drain in Km. 192/2 to 202 |
12A-CG-2003-04-98 |
29.8.2003 |
46.66 |
-- |
25.12 |
Complete6/04 |
6 |
43 |
Reconstruction
of R.C.C. slab culvert in Km. 164/2 |
043-CG-2003-04-123 |
27.2.04 |
13.83 |
|
|
Tender |
|
|
Total
:- 6 Works |
|
|
975.62 |
|
667.16 |
1Complete 3
Progress |
(B) STATUS OF ON GOING NH BRIDGE WORKS (As on 6/04 )
S. No |
N.H. No. |
NAME OF WORK |
JOB No. |
DATE OF SANCT. ORIGINAL & REVISED |
SANCTIONED COST ORIGINAL & REVISED |
LENGTH Km./m |
EXPENDITURE |
STATUS OF WORK AS ON 6/04 |
UPTO DATE 6/04 |
||||||||
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
1 |
043 |
Year 2002-2003 Reconstruction
of H.L. Bridge in Km. 109/10 of N.H. 43 |
043-CG-2002-03-70 |
25.3.2003 |
236.20 |
-- |
124.78 |
Progress |
2 |
06 |
Year 2003-2004 Reconstruction of H.L. Bridge in Km. 90/6 |
06-CG-2003-04-78 |
29.8.2003 |
47.82 |
-- |
25.66 |
Progress |
3 |
043 |
Construction of H.L. Bridge in 207/10 & approaches |
043-CG-2003-04-102 |
30.12.2003 |
800.00 |
-- |
-- |
Tender |
4 |
043 |
Reconstruction of Minor bridge in
Km. 160/8 of N.H. 43 |
043-CG-2003-04-122 |
25.2.04 |
86.73 |
|
|
Tender |
5 |
043 |
Reconstruction of Minor bridge in
Km. 190/6 of N.H. 43 |
043-CG-2003-04-120 |
25.2.04 |
20.08 |
|
|
Tender |
6 |
216 |
Reconstruction of Minor bridge in
Km. 5/6&7/4 of N.H. 216 |
216-CG-2003-04-119 |
25.2.04 |
61.00 |
|
|
Progress |
|
Total |
6 Works. |
|
|
1251.83 |
-- |
150.44 |
3
Progres 3
Tender |
(C) STATUS OF IRQP
(PLAN) PROGRAMME (As on 6/04 )
S.No. |
N.H. No. |
NAME OF WORK JOB NO/DATE OF SANCTION |
LENGTH (KM) |
SANCTONED AMOUNT |
DATE OF START |
EXPENDITURE UPTO 6/04 |
STATUS OF WORK AS ON 6/04 |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
|
1 |
006 |
IRQP in Km. 346 to 353 (Job No. 006-CG-2002-03-61 ) Dt. 19.2.2003 Sanc.No. RW/NH-13012 /2035 / 2002 /CG/NH-5 |
8.0 |
268.78 |
13.5.03 |
137.12 |
Progress |
|
2 |
006 |
IRQP in Km. 241 to 245,261,264 and 265 (Job No. 006-CG-2003-04-100 ) Dt. 29.8.2003 Sanc.No. RW/NH-13012/2061/2002/CG/NH-5 |
8.0 |
143.06 |
-- |
64.95 |
Progress |
|
|
|
Total :- 2 Works |
16.00 |
411.84 |
|
202.07 |
|
|
3 |
043 |
IRQP in Km. 76 to 81 (Job No.043-CG-2003-04-107) Dt. 19.2.2004 Sanc.No.
RW/NH-12014/360/ 2003/CG/ N H-5 |
6.0 |
188.45 |
|
|
Tender |
|
4 |
043 |
IRQP in Km. 82 to 91 (Job No.043-CG-2003-04-108) Dt. 19.2.2004 Sanc.No.
RW/NH-12014/359/ 2003/CG/ N H-5 |
10.0 |
187.50 |
|
|
Tender |
|
5 |
043 |
IRQP in Km. 165,168,177
to 184 (Job No.043-CG-2003-04-89) Dt. 29.8.2003 Sanc.No. RW/NH-13012/2300/2003/CG/NH-5 |
10.0 |
244.59 |
-- |
58.14 |
Complete , liabilities balance |
|
6 |
043 |
IRQP in Km. 185 to 190 (Job No.043-CG-2003-04-84)Dt. 29.8.2003Sanc.No.
RW/NH-13012/2301/2003/CG/NH-5 |
6.0 |
147.84 |
-- |
106.38 |
Complete , liabilities balance |
|
7 |
043 |
IRQP
in Km. 261 to 271 (Job
No.043-CG-2003-04-81) Dt.
29.8.2003 Sanc.No.
RW/NH-13012/2302/2003/CG/NH-5 |
11.0 |
200.14 |
|
|
Tender |
|
8 |
043 |
IRQP
in Km. 279 to 287 (Job
No.043-CG-2003-04-82) Dt.
30.12.2003 Sanc.No.
RW/NH-12014/353/2003/CG/NH-5 |
9.0 |
209.52 |
|
|
Tender |
|
9 |
043 |
IRQP
in Km. 301 to 306 (JobNo.043-CG-2003-04-103) Dt.
30.12.2003 Sanc.No.
RW/NH-12014/354/2003/CG/NH-5 |
6.0 |
142.57 |
|
|
Tender |
|
|
|
Total
:- 7 Works |
58.0 |
1320.61 |
|
164.52 |
- |
|
10 |
016 |
IRQP
in Km. 493 to 498 (Job
No. 016-CG-2003-04-115) Dt.
20.2.2004 |
6.0 |
115.81 |
- |
- |
Tender |
|
|
|
Total
:- 1 Works |
6.0 |
115.81 |
|
164.52 |
- |
|
11 |
200 |
IRQP
in Km. 90/8 to 99 (Job
No. 200-CG-2002-03-49) Dt.
21.5.2002 |
9.4 |
189.47 |
15.7.02 |
164.91 |
Progress |
|
12 |
200 |
IRQP
in Km. 217 to 226 (Job
No.200-CG-2002-03-67) Dt.
13.3.2003 Sanc.No.
RW/NH-13012/2047/2002/CG/NH-5 |
10.0 |
192.24 |
10.6.03 |
36.55 |
Progress |
|
13 |
200 |
IRQP
in Km. 150/10 to 164 /2 (Job
No.200-CG-2002-03-68) Dt.
13.3.2003 Sanc.No.
RW/NH-13012/2059/2002/CG/NH-5 |
13.4 |
134.56 |
29.5.03 |
97.47 |
Progress |
|
14 |
200 |
IRQP
in Km. 100 to 108 (Job
No.200-CG-2002-03-69) Dt.
13.3.2003 Sanc.No.RW/NH-113012/2017
/2002/CG/NH-5 |
9.0 |
162.20 |
10.6.03 |
127.79 |
Complete |
|
15 |
200 |
IRQP in Km. 1
to 9/2 (Job
No.200-CG-2002-03-71) Dt.26.3.2003 Sanc.No
RW/NH-13012/ 2290 /2002/CG/NH-5 |
8.2 |
267.62 |
13.5.03 |
93.19 |
Progress |
|
16 |
200 |
IRQP
in Km. 302 to 313 (Job
No. 200-CG-2002-03-73 ) Dt.
31.3.2003 Sanc.No.
NH-13012/2305/2002/CG/NH-5 |
12.0 |
191.63 |
10.6.03 |
71.64 |
Progress |
|
17 |
200 |
IRQP
in Km. 227 to 236/4 (Job
No. 200-CG-2002-03-75 ) Dt.
31.3.2003 Sanc.No
NH-13012/2048/2002/CG/NH-5 |
9.4 |
130.68 |
29.5.03 |
31.18 |
Progress |
|
18 |
200 |
I.R.Q.P Km. 243/6 to 258/4 (Job
No. 200-CG-2003-04-121 ) Dt.
24-2-04 Sanc.NoSRW/NH-12014/26/2003/CG/N
H-5 |
14.80 |
342.12 |
|
|
Tender |
|
19 |
200 |
IRQP
in Km. 207/4 to216 (Old) (Job
No. 200-CG-2002-03-77 ) Dt.
31.3.2003 Sanc.No.NH-13012/2057/2002/CG/NH-5 |
9.8 |
188.40 |
10.6.03 |
|
Progress |
|
20 |
200 |
IRQP
in Km. 116/10 to127/6 (Job
No. 200-CG-2002-03-54 ) Dt.
31.5.2002 Sanc.No.NH-13012/2067/2002/CG/NH-5
|
10.8 |
203.96 |
16.8.02 |
144.54 |
Progress |
|
21 |
200 |
IRQP
in Km. 109 to116/8 (Job
No. 200-CG-2002-03-42 ) Dt.
18.6.2002 Sanc.No.NH-13012/2015/2002/CG/NH-5
|
7.8 |
200.25 |
14.8.02 |
159.59 |
Complete |
|
22 |
200 |
IRQP
in Km. 140 to 150/8 &176 to 178 (Job
No. 200-CG-2003-4 114 ) Dt.
20.2.2004 Sanc.No.NH-12014/464/2003/CG/NH-5
|
13.80 |
204.43 |
|
|
Tender |
|
|
|
Total
:- 12 Works |
128.40 |
2407.56 |
|
1036.56 |
- |
|
23 |
12A |
IRQP
in Km. 224 to 231
(Job
No. 12A-CG-2003-04-105) Dt.
30.12.03 Sanc.No
NH-13012/229/2003/CG/NH-5 |
8 |
207.07 |
-- |
-- |
Tender |
|
24 |
12A |
IRQP
in Km. 232 to 241/7
(Job
No. 12A-CG-2003-04-101) Dt.
30.12.03 |
9.7 |
182.92 |
-- |
-- |
Tender |
|
|
|
Total 2 Works |
17.70 |
389.99 |
-- |
- |
- |
|
25 |
078 |
IRQP
in Km. 297 to 303 (Job
No. 078-CG-2003-04-95 ) Dt.
29.8.2003 Sanc.NoRW/NH-12014/346/2003/CG/NH-5 |
7.0 |
146.04 |
|
40.00 |
Work in progress |
|
26 |
078 |
IRQP
in Km. 288 to 296 (Job
No. 078-CG-2003-04-104 ) Dt.
30.12.2003 Sanc.NoRW/NH-12014/344/2003/CG/NH-5 |
9.0 |
138.17 |
- |
- |
Tender |
|
27 |
078 |
IRQP
in Km. 314 to 321 (Job
No. 078-CG-2003-04-86 ) Dt.
30.12.2003 Sanc.NoRW/NH-12014/347/2003/CG/
NH-5 |
8.0 |
168.39 |
- |
- |
Tender |
|
28 |
078 |
IRQP
in Km. 322 to 331 (Job
No. 078-CG-2003-04-80) Dt.
30.12.2003 Sanc.NoRW/NH-12014/345/2003/CG/N
H-5 |
10.0 |
161.83 |
23.2.04 |
-- |
Work in Progress |
|
29 |
078 |
IRQP
in Km. 340 to 346 (Job
No. 078-CG-2003-04-91 ) Dt.
30.12.2003 Sanc.NoRW/NH-12014/338/2003/CG/
NH-5 |
7.0 |
152.13 |
- |
-- |
Tender |
|
30 |
078 |
IRQP
in Km. 347 to 354 (Job
No. 078-CG-2003-04-87 ) Dt.
30.12.2003 Sanc.NoRW/NH-12014/331/2003/CG/
NH-5 |
8.0 |
132.95 |
- |
-- |
Tender |
|
31 |
078 |
IRQP
in Km. 374/5 to 377/5 (Job
No. 078-CG-2003-04-90 ) Dt.
30.12.2003 Sanc.NoRW/NH-12014/387/2003/CG/
NH-5 |
3.0 |
77.68 |
26.05.04 |
-- |
Work in Progress |
|
32 |
078 |
IRQP
in Km. 391/8 to 400 (Job
No. 078-CG-2003-04-85 ) Dt.
30.12.2003 Sanc.NoRW/NH-12014/332/2003/CG/
NH-5 |
9.4 |
155.77 |
-- |
-- |
Tender |
|
33 |
078 |
IRQP
in Km. 453 to 462 (Job
No. 078-CG-2003-04-92 ) Dt.
30.12.2003 Sanc.NoRW/NH-12014/341/2003/CG/
NH-5 |
10.0 |
104.68 |
27.02.04 |
-- |
In Progress |
|
34 |
078 |
IRQP
in Km. 514 to 517 & 556 to 560/4 (Job
No. 078-CG-2003-04-97 ) Dt.
30.12.2003 Sanc.NoRW/NH-12014/342/2003/CG/
NH-5 |
8.4 |
111.58 |
|
-- |
Tender |
|
35 |
078 |
IRQP
in Km. 543 to 555 (Job
No. 078-CG-2003-04-106 ) Sanc.NoSRW/NH-12014/340/2003/CG/
NH-5
Dt. 30.12.2003 |
13.0 |
179.49 |
|
-- |
Tender |
|
36 |
078 |
IRQP
in Km. 557 to 566 (Job
No. 078-CG-2003-04-93 ) Dt.
30.12.2003 Sanc.NoRW/NH-12014/337/2003/CG/
NH-5 |
10.0 |
155.45 |
|
-- |
Tender |
|
37 |
078 |
IRQP
in Km. 577 to 584 (Job
No. 078-CG-2003-04-94 ) Dt.
30.12.2003 Sanc.NoRW/NH-12014/330/2003/CG/
NH-5 |
8.0 |
131.29 |
|
-- |
Tender |
|
38 |
078 |
IRQP
in Km. 332 to 339 (Job
No. 078-CG-2003-04-116 ) Dt.
25.02.2004 Sanc.NoRW/NH-12014/330/2003/CG/
NH-5 |
8.0 |
220.79 |
|
-- |
Tender |
|
39 |
078 |
IRQP
in Km. 443 to 452 (Job
No. 078-CG-2003-04-117 ) Dt.
25.02.2004 Sanc.NoRW/NH-12014/330/2003/CG/
NH-5 |
10.0 |
291.33 |
|
-- |
Tender |
|
40 |
078 |
IRQP
in Km. 567 to 576 (Job
No. 078-CG-2003-04-118 ) Dt.
25.02.2004 Sanc.NoRW/NH-12014/330/2003/CG/
NH-5 |
10.0 |
282.46 |
|
-- |
Tender |
|
|
|
Total
:- 16 Works |
138.80 |
2610.03 |
|
40.00 |
- |
|
41 |
216 |
IRQP
in Km. 32 to 40 (Job
No. 216-CG-2003-04-88 ) Dt.
30.12.2003 Sanc.NoRW/NH-12014/217/2003/CG/
NH-5 |
9.2 |
146.84 |
|
-- |
In Progress |
|
42 |
216 |
IRQP
in Km. 51 to 66 (Job
No. 216-CG-2003-04-83 ) Dt.
30.12.2003 Sanc.NoRW/NH-12014/320/2003/CG/
NH-5 |
16.0 |
269.67 |
|
|
Tender |
|
43 |
216 |
IRQP
in Km. 41 to 50 (Job
No. 216-CG-2003-04-109 ) Dt.
19.02.2004 Sanc.NoRW/NH-12014/320/2003/CG/
NH-5 |
10.0 |
161.75 |
|
|
Tender |
|
44 |
216 |
IRQP
in Km. 76/8 to 83 (Job
No. 216-CG-2003-04-110 ) Dt.
19.02.2004 Sanc.NoRW/NH-12014/320/2003/CG/
NH-5 |
7.21 |
178.83 |
|
|
Tender |
|
45 |
216 |
IRQP
in Km. 84 to 91/6 (Job
No. 216-CG-2003-04-124 ) Dt.
26.02.2004 Sanc.NoRW/NH-12014/320/2003/CG/
NH-5 |
7.42 |
187.63 |
|
|
Tender |
|
|
|
Total
:- 5 Works |
49.83 |
944.72 |
|
|
- |
|
46 |
217 |
IRQP
in Km. 36 to 46 (Job
No. 217-CG-2003-04-111 ) Dt.
19.02.2004 Sanc.NoRW/NH-12014/320/2003/CG/
NH-5 |
11.0 |
241.62 |
|
|
Tender |
|
47 |
217 |
IRQP
in Km. 47 to 55 (Job
No. 217-CG-2003-04-113 ) Dt.
19.02.2004 Sanc.NoRW/NH-12014/320/2003/CG/
NH-5 |
9.0 |
208.88 |
|
|
Tender |
|
48 |
217 |
IRQP
in Km. 56 to 66/6 (Job
No. 217-CG-2003-04-112 ) Dt.
19.02.2004 Sanc.NoRW/NH-12014/320/2003/CG/
NH-5 |
10.45 |
216.22 |
|
|
Tender |
|
|
|
Total
:- 3 Works |
30.45 |
666.72 |
|
|
- |
|
|
|
Grand
Total :- 48 Works |
445.18 |
8867.28 |
|
1443.15 |
|
|
S.No. |
N.H.
No. |
NAME OF WORK JOB NO/DATE OF SANCTION |
LENGTH
(KM) |
SANCTONED
AMOUNT |
DATE
OF START |
EXPENDITURE
UPTO 06/04 |
STATUS
OF WORK AS ON 06/04 |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
1. |
043 |
PR
in Km. 116 to 125
(TA-043-CG-2003-04-48) Dt. 31.12.2003 |
10.0 |
186.80 |
- |
- |
Tender |
2 |
043 |
PR
in Km. 126 to 137 (Ex. Km.127) (TA-043-CG-2003-04-49) Dt. 31.12.2003 |
11.0 |
193.31 |
- |
- |
Tender |
|
|
Total
:- 2 Nos. |
21.0 |
380.11 |
|
- |
- |
3 |
016 |
PR
in Km. 499 to 504
(TA-016-CG-2003-04-47) Dt.31.12.2003 |
6.0 |
108.12 |
- |
- |
Tender |
|
|
Total
:- 1 Nos. |
6.0 |
108.12 |
|
- |
- |
|
|
Grand Total :- 3 Nos. |
27.0 |
488.23 |
|
- |
|
(E) STATUS OF OTHER F.D.R. (CONTINUOUS)
WORKS
(Amount in Rs. Lacs)
Sr. No. |
Name of Work |
TA No. |
Date |
Sanctioned Amount |
Date of commence ment |
Expenditure upto |
Status of work as on |
|
|
||||||
JUNE 2004 |
JUNE 2004 |
||||||
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
1 |
FDR
work of NH Div. No. 2 Raipur (2003-04)
|
TA No. 200-12A-CG-2003-04-52 |
12.02.04 |
29.67 |
- |
26.50 |
Complete |
2 |
FDR
work of NH Div. No. 1 Raipur (2003-04)
|
TA No. 6,43,216 & 217-CG-2003-04-53 |
12.02.04 |
84.41 |
- |
75.97 |
Complete |
3 |
FDR
work of NH Div. Jagdalpur (2003-04)
|
TA No. 43-CG-2003-04-51 |
12.02.04 |
25.21 |
- |
61.50 |
Complete |
4 |
FDR
work of NH Div. Bilaspur (2003-04)
|
TA No. 200-CG-2003-04-54 |
12.02.04 |
34.33 |
- |
77.80 |
Complete |
5 |
FDR
work of NH Div. Ambikapur (2003-04) |
TA No. 78-CG-2003-04-50 |
12.02.04 |
85.37 |
- |
124.68 |
Complete |
6 |
FDR
work of NH Div. 2 Raipur (2003-04)
|
TA No. 200,12A-CG-2003-04-56 |
31.03.04 |
181.22 |
- |
- |
Tender |
7 |
FDR
work of NH Div. 1 Raipur (2003-04)
|
TA No. 6, 43,216,217-CG-2003-04-55 |
31.03.04 |
67.36 |
- |
- |
Tender |
8 |
FDR
work of NH Div. Jagdalpur (2003-04) |
TA No. 43-CG-2003-04-58 |
31.03.04 |
31.78 |
- |
- |
Tender |
9 |
FDR
work of NH Div. Ambikapur (2003-04) |
TA No. 78-CG-2003-04-57 |
31.03.04 |
241.55 |
- |
- |
Tender |
|
|
Total :- |
|
780.90 |
|
366.45 |
5 Complete 4 Tender |